API src

Highly reliable PV applications in regions of the European Alps

Description: Das Projekt "Highly reliable PV applications in regions of the European Alps" wird vom Umweltbundesamt gefördert und von Deutscher Alpenverein e.V. durchgeführt. Objective: In the frame of this proposal we intend to demonstrate high reliable PV applications in regions of the European Alps (EURALP) with the help of advanced telemonitoring and control systems. The project consist of 22 subprojects in the range of 1-5 kWp located in mountain regions all over Europe. Involved will be the German Alpine Club (DAV), Serveis Energetics Basic Autonoms (SEBA) from Spain and the Austrian Alpine Club (OEAV). All the proposed systems are stand alone energy supplies for existing mountain lodges in very remote areas. The objects are of great touristic interest and visited by thousands of people each year. Main objective will be the reduction of pollution and noise in natural reserve areas as well as the avoidance of net-CO2 emission. Some of the existing diesel generator sets will be replaced within this project by rape-oil generator sets. The high reliability will be reached by the application at advanced telemonitoring control systems. General Information: Within the EURALP project we intend to demonstrate advanced and high reliable PV systems in regions of the European Alps, were many lightning strikes caused failure or even destroyed the main electronic parts of the systems. This will be reached by implementing an intelligent tele-monitoring system combined with an innovative lightning detection and warning system which is already working in Austria. Since the 22 subprojects are different in their sizes, their power requirements and their natural resources it is impossible to design a standard hybrid system. For that reason it is planned to install at all sites the same advanced energy management system in combination with the monitoring equipment. The total installed PV peak power will be 65 kW. This allows to implement the same control strategy of priority dependent utilization of the power at all subprojects and will lead to a drastical reduction of load peaks, i.e. a high quality energy supply to the consumers. The data acquisition system and the possibility of working with a modem will facilitate, to a large extend, the maintenance and repair time in case of any failure and greatly improve the reliability of the photovoltaic system. Prime Contractor: Deutscher Alpenverein e.V.; München; Germany.

Types:

SupportProgram

Origin: /Bund/UBA/UFORDAT

Tags: Biodiesel ? Dieselkraftstoff ? München ? Überwachungs- und Kontrollinstrumente ? Lärmminderung ? Raps ? Photovoltaikanlage ? Blitz ? Dieselmotor ? Lärmemission ? Pflanzensamen ? Bundesrepublik Deutschland ? Main ? Österreich ? Energieversorgung ? Kohlendioxid ? Schadstoffemission ? Umweltbelastung ? Fernüberwachung ? Sturm ? Alternativtechnologie ? Berg ? Standortwahl ? Emissionsminderung ? Luftschadstoff ? Natürliche Ressourcen ? Reparatur ? Kontrollsystem ? Energie ? Naturschutzgebiet ? Alpen ? Europa ? Frühwarnsystem ? Energiemanagementsystem ? Warnsystem ? Wetter ? Gebirge ? Datenerhebung ? Tourismus ? Klimafaktor ? Schadstoffminderung ? Schutzgebiet ?

Region: Bayern

Bounding box: 12.53381° .. 12.53381° x 47.795° .. 47.795°

License: cc-by-nc-nd/4.0

Language: Deutsch

Organisations

Time ranges: 1996-04-01 - 1999-06-30

Alternatives

Status

Quality score

Accessed 1 times.