API src

Sustainable Construction of Underground Transport Infrastructures (SCOUT )

Description: Das Projekt "Sustainable Construction of Underground Transport Infrastructures (SCOUT )" wird vom Umweltbundesamt gefördert und von Eccon, Engineering-Computer-Consulting GmbH, Design Department durchgeführt. Objective: Cut and cover tunnels are a vital tool for the construction of transport infrastructures which are needed for the development of the Trans European Transport Network. This method is widely used for the construction of road/railways tunnels, but it must now satisfy a new set of requirements: urgent need for safer and more cost effective techniques and reduction of environmental impact of the construction (use of natural resources, noise, disruption of traffic, etc). The SCOUT project introduces a breakthrough for the construction of cut-and-cover tunnels, which is characterised by a holistic approach: - Implementation of the Observational Method for a full control of construction and delays, -Optimisation of the design, based on the central concept of double-skin structure, -A radically new construction concept of equipment, with a modular architecture to be used in a large variety of tunnel configurations and soil profiles, -Development and testing of new applications of composites materials to optimise the efficiency of the structure, -Establishing a roadmap towards the recycling of excavated materials. The project is driven by industrial partners, and will include the construction of a pilot wall to validate the construction concept and the execution of full scale tests on composite structure members . Project results will decrease construction costs by more than 30Prozent and production lead times by 30Prozent, and will therefore open new perspectives for the construction of cut-and-cover tunnels to create or upgrade new transport infrastructures. They will include: -Recommendations guides for the optimisation of cut-and-cover projects, -Guide for the implementation of the Observational Method; -A breakthrough concept of drilling equipment for the construction of cut-and-cover tunnels, -New concepts for composite cut-and-cover structure members. Prime Contractor: Soletanche Bachy France; Nanterre; France.

Types:

SupportProgram

Origin: /Bund/UBA/UFORDAT

Tags: Verkehrslärmminderung ? Recycling ? Verbundwerkstoff ? Lärmminderung ? Straße ? Werkstoff ? Schall 03 ? Eisenbahntunnel ? Frankreich ? Baulärm ? Tunnel ? Umweltauswirkung ? Blei ? Architektur ? Gebäude ? Natürliche Ressourcen ? Nachhaltiges Bauen ? Bautechnik ? Bodenprofil ? Haut ? Infrastrukturplanung ? Lärm ? Technik ? Verkehrsnetz ? Wirkungsgrad ? Boden ? Wirkung ? Abdeckung ? Bedarf ? Bohrung ? Infrastruktur ? Ressourcennutzung ? Umwelt ? Verkehrsinfrastruktur ? Verkehrssystem ? Planung ? Verkehr ? Kosten ? Infrastrukturentwicklung ? Verkehrsrückgang ? Produktion ? NACHHALTIG ? PROJEKT ? GANZHEITLICH ? VERFRACHTUNG ? GEBRAUCHT ? INDUSTRIELL ? VERRINGERUNG ? Verwertung ? EMPFEHLUNG ? WAND ? Werkzeug ? KONTROLLE ? Radikal [Chemie] ? METHODE ? BEWERTEN ? ABNAHME ? ENTWICKLUNG ? AUSRUESTUNG ? ERFORDERNIS ? NEU ? PERSPEKTIVE ? ERGEBNIS ? Baukosten ? FP6-SUSTDEV ? UNTERSUCHUNG ?

License: cc-by-nc-nd/4.0

Language: Deutsch

Organisations

Time ranges: 2005-01-01 - 2007-12-31

Alternatives

Status

Quality score

Accessed 1 times.