Description: Das Projekt "Application of ductile cast iron pipes in the district heating system saar-west" wird vom Umweltbundesamt gefördert und von Fernwärme-Verbund Saar GmbH durchgeführt. Objective: To build and operate a pre-insulated district heat transmission pipe system of ductile cast iron socket pipes with pressed-through passages and stilt supports. The expected advantages of such a system were the considerable cost savings during construction and the short installation time. The cast-iron pipes are connected with coupling sleeves as part of the Saar district heating distribution system. The innovative concept was expected to diminish corrosion and avoid the need for expensive welding and heat compensation measures at the weld. General Information: The project concerns the installation of a district heating transmission line consisting of cast-iron socket pipes with pressed-through passages and stilt support. The new pre-insulated pipes were part of the new construction of the central transmission system Saar-West in Germany. The transmission pipes transport the heat from the place of heat generation at the 'Dillinger Hütte' in Dillingen to the city of Saarlouis. Other supply areas were connected to the central transmission system as well. The total length of the line is 4 km. 3.6 km of this are made up of cast-iron pipes of which 2.5 km are underground, 0.9 km are above ground on concrete pedestals, 0.175 km of this are pressed through passages under roads and 0.03 km are on a footbridge. The pipes are made of cast-iron and were therefore expected to be resistant to corrosion. They are insulated with polyurethane material and are couples with flexible gaskets which absorb the expansion forces. Therefore, the expensive and time consuming welding with the addition of expansion compensating devices were not required. A pipeline monitoring system was installed along the entire length of the pipes. At defined intervals along the pipe hybrid modules were located 1 m from a socket connection. Nominal width: 500/300/250 Nominal pressure: PN 25 Operating temperatures: 130 deg. C. Achievements: The installation of 4.4 km was completed at the end of September 1986. After a successful pressure test the line was commissioned in October 1986. The aim of lowering low laying costs and shortening of the assembly time was achieved. In the operation the system could not meet the stipulated requirements. Considerable damages to the insulation material and the sleeves led to a drastic reduction in life expectancy. Parts of the pipes have to be replaced in the near future. The installed control and monitoring system operated satisfactorily.
Types:
SupportProgram
Origin: /Bund/UBA/UFORDAT
Tags: Dämmstoff ? Beton ? Gusseisen ? Polyurethan ? Saarland ? Mitteldeutschland ? Fernwärme ? Resistenz ? Wärmeversorgung ? Bundesrepublik Deutschland ? Saar ? Betriebsdaten ? Innenstadt ? Schadensminderung ? Wärmeübertrager ? Wärmeerzeugung ? Korrosion ? Rohrfernleitung ? Anlagenüberwachung ? Anwendungstechnik ? Energieeinsparung ? Energietechnik ? Informationsvermittlung ? Investitionskosten ? Kostensenkung ? Lebenserwartung ? Modul ? Monitoring ? Stadt ? Physikalische Größe ? Rohrleitung ? Schweißen ? Heizung ? Anlagenbetrieb ? Umweltfreundliche Technologie ? Anlagenbau ? Abdichtung ? Transmission ? Isolierung ? Dillingen ? Saarlouis ? Wärmetransport ? renewable sources of energy ?
Region: Saarland
Bounding box: 6.96083° .. 6.96083° x 49.40472° .. 49.40472°
License: cc-by-nc-nd/4.0
Language: Deutsch
Time ranges: 1985-11-08 - 1992-09-30
Accessed 1 times.