API src

Hybridsystem Sonne-Wind - Pellworm

Description: Das Projekt "Hybridsystem Sonne-Wind - Pellworm" wird vom Umweltbundesamt gefördert und von Telefunken Systemtechnik Hamburg durchgeführt. Objective: Three wind generators (30 KW each) will be connected with an existing 300 KW solar p.v. plant in order to demonstrate the interesting advantages of combining two different renewable energy sources. It is a hybrid solar-wind powered autonomous system with existing battery storage. It will allow designers to determine the smallest number of batteries necessary to safely operate such a hybrid system. Estimated total wind energy production: 220,000 KWh/yr. General Information: Three HSW 30 downwind, 2 bladed wind turbines have been installed and are operating next to an existing 300 KW solar p.v autonomous, with battery storage plant on the island of Pellworm. In order to study the contribution of wind energy coming from different wind machines at a rough North Sea environment and to show the feasibility of such a system in practical application. As wind and photovoltaic power are complementary, each being plentifull in the season the other is decreased, will allow designers to determine the lowest number of batteries necessary to safely operate the system, while the safety of the system will be increased. This is expected to lead to a reduction of the necessary battery installed capacity which will correspond to an amount of 300,000 DM. The annual wind energy yield is estimated to be 220,000 KWh and will be used in parallel with the p.v. solar energy for battery charging and/or grid connection, depending on the needs of the system and the grid. The project is replicable and it is expected that the results of it will allow a reduction of 35 per cent of the total cost. An important increase of the availability of the whole system is also expected. Achievements: Wind turbines were in operation in 11.05.89, when the measuring phase began. Up to 10.9.1990, the wind turbines operated for 5.400 hours on an average base, and they produced 201 MWh in total. The project is now ripe for commercialisation.

Types:

SupportProgram

Origin: /Bund/UBA/UFORDAT

Tags: Kraftwerksleistung ? Windgeschwindigkeit ? Photovoltaikanlage ? Hamburg ? Akkumulator ? Erneuerbarer Energieträger ? Solarenergie ? Windenergie ? Windkraftanlage ? Blei ? Wind ? Solaranlage ? Island ? Pellworm ? Batteriespeicher ? Altanlage ? Alternative Energie ? Batterie ? Stromerzeugung ? Energieversorgung ? Hybridantrieb ? Solartechnik ? Verfahrenskombination ? Insel ? Anlagensicherheit ? Energiegewinnung ? Energietechnik ? Studie ? Systemtechnik ? Energieertrag ? Produktdesign ? Nordsee ? Umweltfreundliche Technologie ? Anlagenbau ? Standortbedingung ? Energiespeicherung ? Eignungsfeststellung ? Turbomaschine ? Anlagenbemessung ?

Region: Hamburg

Bounding box: 9.99302° .. 9.99302° x 53.55073° .. 53.55073°

License: cc-by-nc-nd/4.0

Language: Deutsch

Organisations

Time ranges: 1985-02-01 - 1990-06-30

Alternatives

Status

Quality score

Accessed 1 times.