API src

Found 1359 results.

Related terms

Hot gas-cleaning

Das Projekt "Hot gas-cleaning" wird vom Umweltbundesamt gefördert und von DMT-Gesellschaft für Forschung und Prüfung mbH durchgeführt. General Information: Descriptions of the individual parts of the project are given below. Removal of trace elements in hot gas cleaning systems (CSIC). Study of the capture of trace elements by a range of different sorbents - mainly metal mixed oxides, clay materials and alkaline-earth carbonates but also some alumina and siliceous materials - in two laboratory scale reactors (a fixed bed and a fluidised bed) at temperatures between 550 and 750 degree C. Different compositions of the simulated coal gas stream will also be tested. Different sorbents, temperatures and stream gas composition will be studied during each of three periods of six months in each of the three years of the programme. Hot H2S Removal by using waste products as solvents (TGI). Testing of red mud (a residue from aluminium manufacture) and electric arc furnace dust (a residue from steel making) as sorbents for hot dry desulphurisation of coat derived fuel gas. These materials have been chosen as containing potential sorbents including calcium, iron, zinc and manganese oxides. Tests will be carried out in a laboratory-scale pressurised reactor. Use of carbon materials and membranes for hot gas clean up (DMT). Study of the potential use of carbon materials for removing trace metals and sulphur compounds from hot gasification gases (also potentially the separation of light gases such as hydrogen), taking advantage of the stability of carbon at high temperature and in corrosive atmospheres. A bed of carbon (or, where appropriate, another material) alone or in combination with a carbon filtering membrane installed in a laboratory gas circuit will be used: - to study the effect on composition of passing gas from a gasifier through a bed of activated carbon or a carbon molecular sieve at various temperatures, pressures and flow rates. - to repeat the studies as above with a filtering membrane made from carbon added. - to study the combination of sorption/filtration and catalytically active materials (i.e. using catalysts for the CO shift and for hydrogenation). The use of other compounds such as zeolitic membranes or granular beds will also be considered and the advantages of using combined gas clean up systems will be reviewed in the light of the data obtained. Development of improved stable catalysts and trace elements capture for hot gas cleaning in advanced power generation (CRE Group). Studies will be carried out on existing equipment to improve and assess catalysts based on iron oxide on silica and titania with mixed metal oxides to remove ammonia, hydrogen cyanide, hydrogen chloride, arsine, hydrogen sulphide and carbonyl sulphide. Selected catalysts will be tested at pressures up to 20 bar and temperatures in the range 500 - 800 degree C using simulated atmospheres. ... Prime Contractor: Deutsche Montan Technologie, Gesellschaft für Forschung und Prüfung mbH (DMT); Essen; Germany.

Erection of a 250 KWel/237KWth - PEM fuel cell plant for combined heat and power production in Berlin-Treptow

Das Projekt "Erection of a 250 KWel/237KWth - PEM fuel cell plant for combined heat and power production in Berlin-Treptow" wird vom Umweltbundesamt gefördert und von Berliner Kraft- und Licht durchgeführt. Objective: The aim is to show that the integration of the PEM fuel cell into district heating systems can be an ideal supplement or alternative to the established technology used in cogeneration plants. This can only be done by setting up a plant with an output comparable to what is standard in cogeneration plants. A plant of this kind has not been installed to date. The general benefits of fuel cell technology - high level of efficiency, virtually no moving parts, low noise emission levels, very low waste gas emission levels, minimum maintenance - are enhanced by the use of the PEM cell. The relatively low operating temperature of around 80 degree C permits the use of low-price materials and ensures a fast start-up. Moreover, the temperatures of central heating systems. The waste heat of the cell can, therefore, be used without the need for any expensive hydraulic circuits or storage facilities. This makes the cell suitable for use in small-scale district heating systems. A considerable market potential is forecast for the PEM cell in the medium term since it is well suited for series manufacture. The aim of the demonstration project is to fulfil the requirements for series manufacture. This will make it possible in the medium term to reduce the currently high specific costs of around 13000 ECU/KW to less than 1500 ECU/KW General Information: A Proton Exchange Membrane Fuel Cell (PEMFC), also know as a Solid Polymer Fuel Cell (SPFC), with an output of 250 kWel/237 kWth is to be installed in the Berlin district of Treptow. The fuel cell is to be integrated into an existing district heating system run by BEWAG which currently has an installed thermal output of 43.4 MW. The temperatures in the heating system's return permit easy assimilation of the available heat. The fuel cell is to be operated using natural gas which is converted into hydrogen and carbon dioxide by the addition of oxygen in a reforming process. In addition the operation with gas-storaged hydrogen is planned. The aim is to permit the both heat and power orientated generation. Full-load operation for the generation of heat can be maintained throughout the year. The auxiliary cooler which is installed makes it possible to generate power irrespective of the level of heat required. The low operating temperature predestinates the PEM fuel cell - as conventional small CHP stations - to cover the basic heat load. For the covering of peak loads during very cold days the existing peak boilers will supply heat. The location of the plant in Berlin's city centre and its immediate proximity to the BEWAG headquarters are ideal for the presentation of the project to the public. The needs of specialists visiting the plant can be well catered for and there are no obstacles to the free flow of information. ... Prime Contractor: Berliner Kraft- und Licht (BEWAG) Aktiengesellschaft; Berlin; Germany.

Teilprojekt 1

Das Projekt "Teilprojekt 1" wird vom Umweltbundesamt gefördert und von Fraunhofer-Institut für Schicht- und Oberflächentechnik durchgeführt. Das Projekt SERPIC wird eine integrierte Technologie zur Reduzierung der Spurenschadstoffe und Krankheitserreger (contaminants of emerging concerns, CECs) im Abfluss von Kläranlagen entwickeln, die auf einem Multi-Barrieren-Ansatz beruht. Dazu werden Membran-Nanofilter verwendet, die die CECs um mindestens 90 % reduzieren sollen und dabei die im Abwasser enthaltenen Nährstoffe im Durchflussstrom beibehalten. SERPIC adressiert das Hauptthema 3 - Taking Actions der Ausschreibung mit den Unterthemen 3.2 und 3.3. Darüber hinaus adressiert das Projekt die Unterthemen 1.1, 1.2 und 2.1 der anderen zwei Hauptthemen.

Sub project F

Das Projekt "Sub project F" wird vom Umweltbundesamt gefördert und von inge GmbH durchgeführt. Im Fokus des hier beantragten Teil-Projektes stehen die Optimierung der Betriebsbedingungen von inge Ultrafiltrationsanlagen (UF) zur Aufbereitung von nährstoffreichen Wässern zu Trinkwasser in Zeiten von Algenblüten bei gleichzeitiger Verringerung der spezifischen Aufbereitungskosten und die Untersuchung der Auswirkungen von Algenblüten auf den Betrieb von inge UF-Membranen. Es sind vier Arbeitspakete (AP) vorgesehen. AP1 behandelt vorbereitende und unterstützende Arbeiten wie Planungen oder Kauf und Umbau von Anlagen sowie die Herstellung von Membranmodulen, in AP2 werden in Zusammenarbeit mit dem Projektpartner IWW, Dr. A. Nahrstedt, grundlegende Untersuchungen zur UF von algenhaltigen Suspensionen durchgeführt. IWW liefert mit seiner langjährigen wissenschaftlichen Erfahrung in den Bereichen Membrantechnik und Prozessdesign die Voraussetzung für die erfolgreiche Umsetzung des durch inge eingebrachten technischen Know-hows in ein marktfähiges Produkt. AP3 dient der vor-Ort Demonstration der inge Technologie mittels einer Pilotanlage, bei deren Bau und Betrieb die Ergebnisse von AP2 einfließen. AP4 ist projektbegleitend und beinhaltet Projektmanagement und -controlling, Organisation und Durchführung der Anlagentransporte sowie das Berichtswesen. Die ersten drei AP sind zeitlich aufeinander abgestimmt und setzen die erfolgreiche Erledigung mindestens einiger Arbeitsabschnitte der jeweils vorhergehenden AP voraus.

Almeria solar powered reverse osmosis plant

Das Projekt "Almeria solar powered reverse osmosis plant" wird vom Umweltbundesamt gefördert und von DaimlerChrysler Aerospace AG durchgeführt. Objective: To demonstrate, that small scale PV powered water desalination plants can be constructed in a compact and cost efficient way. This type of plant is urgently needed in Southern Europe and Developing Countries. Intensive publicity is intended and good commercialisation is expected (100 systems potential market in Spain only). General Information: On the site of the ALMERIA university, brackish water is pumped from a well of 60m. Drinking water (about 8000 cbm per year) obtained by a reverse osmosis plant is stored for consumption. A 23.5 kWp PV generator supplies the required energy. Number of subsystems: 1 Power of subsystems: 23.5 kWp Total power: 23.5 kWp Module description: 612 AEG type PQ 10/20/01;(Typ I) + 306 AEG type PQ 10/40/01;(T.II) (I): 20 10x10cm poly crist. cells, 6 V,16.5 W (II): 40 10x10cm poly crist. cells, 12 V,38.4 W Very high resistance glass; UV stabilized PVB; 6.7 kg; 0.25 or 0.5 sqm. Connections: type 20: 36 series, 17 parall.: type 40: 18 series, 17 parall. Support: on racks Max. power tracker: included in inverter Charge controller: charge/discharge regulator: special design, microprocessor controlled. Battery: Spanish TUDOR, 110 cells Battery Volt.: 220 V; Battery capacity: 2240 Ah.(at 100 h). (1650 Ah (10h); type C 10 Battery capacity: 493 kWh.(at 100 h). Inverter: (for well water pump only): AEG, Solarverter, type SV3 sinusoidal, transistor-pulse type, 3 kHz. Input nominal: 130 to 300 V DC in; max 16 A Dc; Output nominal: 3.3 kVA; 13 to 127 V out; 3 phases; to 50/60 Hz. Load description: PLEUGER submersible pump NE612 for raw water pumping. (three phase, AC motor, hence inverter necessary). 4.2 cbm/h, header 30 m. Rated power 2.2 kW. ROCHEM (Hamburg) reverse osmosis, type RORO 1535-B 709165; presses raw water through membrane. Input: 92 cbm/day at 7000 ppm; Output: 60 cbm/day at smaller than 500 ppm. New type of PLATE MODULE system, with turbulent flow on the feed water side and hence less membrane scaling and fouling which leads to less maintenance. The pressure pump of the RO system works with 220 V DC motor, 6750 W, avoiding inverters. Monitoring: Weather station; Reading every 10 seconds six relevant plant data, averaging over ten minutes, storing on floppy. (DAM 800 data acquisition system by TELEFUNKEN). Stored data: (1) Insolation, array plane. (2) amb. temp. (3) module temp. (4) array output energy. (5) energy to and from battery. (6) inverter dc energy. Achievements: While the pv generator and the batteries worked without problem the water pumps, the reverse osmosis plant, the inverter and the monitoring system had several, partly major, failures. The Final Report on System Monitoring (5 June 95) analyses 32 month of operation and puts in evidence: the system is well designed for its task; however the frequent failures of some components decrease its effective utilisation. The plant will continue to operate after the end of the project with some improvements (new pumps, new membranes, etc.)...

Defining the role of a low affinity cation transporter in salt and drought tolerance of barley (Hordeum vulgare L.)

Das Projekt "Defining the role of a low affinity cation transporter in salt and drought tolerance of barley (Hordeum vulgare L.)" wird vom Umweltbundesamt gefördert und von Universität Halle-Wittenberg, Institut für Agrar- und Ernährungswissenschaften, Professur für Pflanzenernährung durchgeführt. Cation transport processes across membranes are a major element of plant abiotic stress tolerance. Tolerance to salt stress strongly depends on the plant's ability to prevent entry of Na+ into the cell, as well as to exclude and/or compartmentalise the ion. In addition, all stresses evoke specific elevations of cytosolic free calcium (cyt) through the activation of Ca2+ channels. These cyt signals are crucial for the initiation of stress responses by activating Ca2+-dependent downstream elements. Roles of cation channels and transporters identified in this project will be exploited in subsequent phases of the IZN to improve the stress tolerance of cereals through conventional and transgenic breeding approaches.

Teil 1

Das Projekt "Teil 1" wird vom Umweltbundesamt gefördert und von Deutsches Zentrum für Luft- und Raumfahrt e.V., Institut für Technische Thermodynamik durchgeführt. Für eine optimale Leistungsfähigkeit von Brennstoffzellen und möglichst geringe Degradation ist eine homogene elektrochemische Aktivität und Temperatur über den gesamten Bereich der Elektroden erwünscht, da eine inhomogene Stromdichte- oder Temperaturverteilung zu einer verringerten Nutzung der Reaktanden oder des Katalysators führt, was sich in einem erniedrigten Wirkungsgrad niederschlägt. Auch die Langzeitstabilität von Zellkomponenten kann durch die ungleichmäßige Verteilung der elektrischen und thermischen Eigenschaften über die Zelle negativ beeinflusst werden. Daher besteht bei den Entwicklern von Brennstoffzellen der starke Wunsch, über entsprechende zu entwickelnde analytische Methoden Informationen über die lokale Verteilung der elektrischen, chemischen und thermischen Eigenschaften zu erhalten, die für eine Verbesserung der Zellen und des Designs genutzt werden können. Im Bereich der Niedertemperatur-Polymermembran-Brennstoffzellen wurden hier vor einigen Jahren umfangreiche Entwicklungen hauptsächlich zur Messung der Stromdichteverteilung begonnen, während es im Bereich der oxidkeramischen Hochtemperaturbrennstoffzelle auf Grund der erhöhten Anforderungen bei den hohen Betriebstemperaturen von 700-1000 C bisher erst relativ wenige Ansätze für eine ortsaufgelöste Messtechnik gab. Ziel des vorliegenden Forschungsvorhabens ist das detaillierte Verständnis der grundlegenden Ursachen, insbesondere der Zusammenhänge von örtlichen Inhomogenitäten mit Betriebsbedingungen, Zellgeometrie und Zellleistung. Hierzu wird in einem integrierten Ansatz insbesondere die Kombination von hochentwickelten experimentellen Methoden mit detaillierten physikalisch-chemischen Modellen und Simulationsrechnungen zum Einsatz gebracht. Die Simulationsrechnungen erlauben die Vorhersage der örtlich verteilten Konzentrationen von Gasphasen-Spezies und Temperatur sowohl in den Gaskanälen als auch innerhalb der porösen Elektroden. Durch das Zusammenspiel von Experiment und Modellierung in einem iterativen Prozess soll ein hinreichend detailliertes Modell erhalten werden, das den komplexen Vorgängen innerhalb der SOFC gerecht wird.

Conversion of Low Grade Heat to Power through closed loop Reverse Electro-Dialysis (RED-Heat-to-Power)

Das Projekt "Conversion of Low Grade Heat to Power through closed loop Reverse Electro-Dialysis (RED-Heat-to-Power)" wird vom Umweltbundesamt gefördert und von WIP, Wirtschaft und Infrastruktur GmbH & Co Planungs-KG durchgeführt. The concept is based on the generation of electricity from salinity gradient using Reverse Electrodialysis with artificial saline solutions operating in a closed-loop. The original salinity gradient is regenerated by a separation step that uses heat at 40 - 100 C. The regenerated solutions can be stored at very low costs and the stack can react within seconds, providing flexibility to the power system. It is a quiet technology operating under normal pressures and temperatures imposing no risks. The industrial partners ensures the MRL will be kept aligned with the advances in TRL. The overall objective is to prove this revolutionary concept, develop the necessary materials, components and know-how for bringing it to the level of a lab prototype generating electricity from low-grade heat at higher efficiencies and lower costs than ever achieved to date. Specific objectives: Select the most suitable technologies for the regeneration process and the combinations of salts and solvents that can maximise the system performance. Create new knowledge for developing: membranes for the selected solutions; membrane manufacturing concepts that can be scaled-up for high volume and low-cost production; efficient stacks suitable for this application; energy efficient regeneration processes. Implement and validate a process simulation tool to analyse the performance under different configurations and operating conditions. Evaluate and improve the performance of the overall system through tests on a lab-prototype, identifying potential up-scaling and operational issues (System efficiencies reaching 15% and power densities of 25 W/m2 of cell pair). Define a development roadmap, taking into account environmental, social and regulatory issues, leading to levelised cost of electricity below 0.03 Euro/kWh by 2025 to 2030. Involve target group representatives to the Advisory Board and communicate the key results in order to initiate a dialogue and facilitate the engagement of key actors.

Bionik (2): Bionischer Oxygenator nach dem Vorbild der Lunge von Säugetieren

Das Projekt "Bionik (2): Bionischer Oxygenator nach dem Vorbild der Lunge von Säugetieren" wird vom Umweltbundesamt gefördert und von Charite, Universitätsmedizin Berlin, Campus Virchow, Labor für Biofluidmechanik durchgeführt. Vorhabenziel: Nach dem Prinzip der Bionik soll eine Problemlösung der Natur auf ein technisches Problem übertragen werden. Für unseren Fall bedeutet dies, in einer Machbarkeitsstudie die Möglichkeit einer Bildung von stabilen alveolenähnlichen Ausstülpungen auf der Oberfläche von Kapillar- bzw. Plattenmembranen, die die Flüssigkeits- und Gasphase trennen, zu prüfen. Dadurch soll die Erhöhung der Effizienz von Oxygenatoren bzw. von Bioreaktoren zur Züchtung von Zellen erreicht werden. Arbeitsplanung: 1. Auslegung des Oxygenators nach dem neuen Prinzip für die Oxygenierung des Blutes und des Nährmediums ' Dicken der Membranschichten, Größen der Öffnungen und Größen der Ausstülpungen, Volumenströme und Drücke. 2. Entwicklung und Bau einer Testkammer zur mikroskopischen Untersuchung. 3. Herstellung von neuen Oxygenatormembranen mit verschiedenen Stoffen für die Beschichtung und deren Testung in der Testkammer. Die gewonnenen Ergebnisse sollen zur Erhöhung der Effizienz und der Reduzierung der Größe von Oxygenatoren eingesetzt werden. Dies ermöglicht die Entwicklung von implantierbaren Oxygenatoren. Eine weitere Ergebnisverwertung ist der Einsatz bei der Entwicklung von Bioreaktoren.

Teilprojekt 2

Das Projekt "Teilprojekt 2" wird vom Umweltbundesamt gefördert und von SolarSpring GmbH durchgeführt. Das Projekt SERPIC wird eine integrierte Technologie zur Reduzierung der Spurenschadstoffe und Krankheitserreger (contaminants of emerging concerns, CECs) im Abfluss von Kläranlagen entwickeln, die auf einem Multi-Barrieren-Ansatz beruht. Dazu werden Membran-Nanofilter verwendet, die die CECs um mindestens 90 % (Text abgebrochen)

1 2 3 4 5134 135 136