technologyComment of barite production (CA-QC, RER, RoW): Barite is mined both in open pit and underground mines. About 60 to 120 kg of Barite can be yielded from one cubic meter of ore. The ore is transported via lorry (usually less than 5km) to a washing installation. Subsequently, it is separated from the water and grinded wet or dry. Between 65% and 85% of barite contained in the ore can be extracted. This dataset includes resource extraction and processing of the material. technologyComment of niobium mine operation and beneficiation, from pyrochlore ore (BR, RoW): Open-pit mining is applied and hydraulic excavators are used to extract the ore with different grades, which is transported to stockpiles awaiting homogenization through earth-moving equipment in order to attain the same concentration. Conveyor belts (3.5 km) are utilized to transport the homogenized ore to the concentration unit. Initially, the ore passes through a jaw crusher and moves to the ball mills, where the pyrochlore grains (1 mm average diameter) are reduced to diameters less than 0.104 mm. In the ball mills, recycled water is added in order to i) granulate the concentrate and ii) remove the gas from the sintering unit. The granulated ore undergoes i) magnetic separation, where magnetite is removed and is sold as a coproduct and ii) desliming in order to remove fractions smaller than 5μm by utilizing cyclones. Then the ore enters the flotation process - last stage of the beneficiation process – where the pyrochlore particles come into contact with flotation chemicals (hydrochloric & fluorosilic acid, triethylamene and lime), thereby removing the solid fractions and producing pyrochlore concentrate and barite as a coproduct which is also sold. The produced concentrate contains 55% Nb2O5 and 11% water and moves to the sintering unit, via tubes or is transported in bags while the separated and unused minerals enter the tailings dam. In the sintering unit, the pyrochlore concentrate undergoes pelletizing, sintering, crushing and classification. These units not only accumulate the material but are also responsible for removing sulfur and water from the concentrate. Then the concentrate enters the dephosphorization unit, where phosphorus and lead are removed from the concentrate. The removal of sulphur and phosphorus have to be executed because of the local pyrochlore ore composition. Then the concentrate undergoes a carbothermic reduction by using charcoal and petroleum coke, producing a refined concentrate, 63% Nb2O5 and tailings with high lead content that are disposed in the tailings dam again.
Die Schallimmissionspläne (Städte sh. unten) gliedern sich auf in: 1. Daten zu natürl. und künstl. Hindernissen ausgewählter Städte: Angabe von Koordinaten (x, y und z) 2. Emissions- und Immissionsdaten von lärmrelevanten Gewerbebetrieben ausgewählter Städte: 3. Emissions- und Immissionsdaten von lärmrelevanten Sport- und Freizeitanlagen ausgewählter Städte: 4. Emissions- und Immissionsdaten von Straßen und Parkplätzen ausgewählter Städte: 5. Emissions- und Immissionsdaten von Schienen- und Rangierverkehr 6. Emissions- und Immissionsdaten von Wasserverkehr 7. Emissions- und Immissionsdaten militärische Anlagen zu 1.) natürl. Hindernisse: Geländeprofil (Höhenlinien, Böschungskanten, Geländeeinschnitte) künstl. Hindernisse: Bebauung (Einzelhindernisse, teilw. Einzelbebauung zusammengefaßt in homogene Gebiete mit einheitl. Höhe und Bebauungsdämpfung); - Schallschirme (Lärmschutzwände, -wälle, Wände); - zusammenhängende Waldgebiete; - größere Wasserläufe, Gewässer zu 2.) Emissionsbeurteilung erfolgte nach TA Lärm bzw. VDI 2058, Angabe von Koordinaten (x, y und z) und für die Berechnung benötigten Eingangsdaten der einzelnen Betriebe und Gewerbegebiete Lärmrelevante Betriebe wurden mittels Messung beurteilt, andere erhielten Standarddaten aus der Fachliteratur, Gewerbegebiete erhielten größtenteils Flächenbezogene Schalleistungspegel entsprechend der DIN 18005. zu 3.) Emissionsbeurteilung erfolgte nach 18.BImSchV, Angabe von Koordinaten (x, y und z) und für die Berechnung benötigten Eingangsdaten der einzelnen Stätten, Lärmrelevante Sport- und Freizeitanlagen wurden mittels Messung beurteilt, andere erhielten Standarddaten aus der Fachliteratur zu 4.) Emissionsberechnung erfolgte nach RLS-90, Angabe von Koordinaten (x, y und z) und für die Berechnung benötigten Emissionsdaten (Regelqerschnitt, DTV, p, Straßenoberfläche, Steigung, Straßengattung) der Steckenabschnitte, die Zähldaten liegen für alle Städte für den Istzustand, für ausgewählte auch für verschiedene Prognosevarianten 2010 vor. Die Emissionsdaten können mit einem Editor aktualisiert werden. zu 5) Emissionsberechnung erfolgte mit Schall 03. Die Zähldaten liegen für alle Städte für den Istzustand und für den Prognosezustand 2010 vor. Rangierverkehr teilweise mit Akustik 04, sonst über FBS nach DIN18005. zu 6.) Emissionsberechnung über FBS nach DIN 18005 bzw. für Motorboote als Linienquelle, Eingangsdaten abgeschätzt zu 7.) Berechnung der Emissionen ausschließlich über FBS Folgende Projekte wurde in den einzelnen Jahren bearbeitet bzw. sind geplant: 1992 Güstrow (SIP) 1993 Rostock (V), Schwerin (V), Greifswald 1994 Stralsund, Wismar, Neubrandenburg, Grevesmühlen 1995 Bützow, Ludwigslust 1996 Güstrow (SIP, LMP), Waren 1997 Neustrelitz, Ribnitz-Damgarten, Laage, Malchin 1998 Malchow, Bad Doberan, Wolgast (SIP), Anklam, Pasewalk, Parchim 1999 Neubukow, Wittenburg, Wolgast (LMP) 2000 Hagenow, Bergen, Kaiserbäder (Ahlbeck, Her.-dorf, Bansin)
Die Schallimmissionspläne (Städte sh. unten) gliedern sich auf in: 1. Daten zu natürl. und künstl. Hindernissen ausgewählter Städte: Angabe von Koordinaten (x, y und z) 2. Emissions- und Immissionsdaten von lärmrelevanten Gewerbebetrieben ausgewählter Städte: 3. Emissions- und Immissionsdaten von lärmrelevanten Sport- und Freizeitanlagen ausgewählter Städte: 4. Emissions- und Immissionsdaten von Straßen und Parkplätzen ausgewählter Städte: 5. Emissions- und Immissionsdaten von Schienen- und Rangierverkehr 6. Emissions- und Immissionsdaten von Wasserverkehr 7. Emissions- und Immissionsdaten militärische Anlagen zu 1.) natürl. Hindernisse: Geländeprofil (Höhenlinien, Böschungskanten, Geländeeinschnitte) künstl. Hindernisse: Bebauung (Einzelhindernisse, teilw. Einzelbebauung zusammengefaßt in homogene Gebiete mit einheitl. Höhe und Bebauungsdämpfung); - Schallschirme (Lärmschutzwände, -wälle, Wände); - zusammenhängende Waldgebiete; - größere Wasserläufe, Gewässer zu 2.) Emissionsbeurteilung erfolgte nach TA Lärm bzw. VDI 2058, Angabe von Koordinaten (x, y und z) und für die Berechnung benötigten Eingangsdaten der einzelnen Betriebe und Gewerbegebiete Lärmrelevante Betriebe wurden mittels Messung beurteilt, andere erhielten Standarddaten aus der Fachliteratur, Gewerbegebiete erhielten größtenteils Flächenbezogene Schalleistungspegel entsprechend der DIN 18005. zu 3.) Emissionsbeurteilung erfolgte nach 18.BImSchV, Angabe von Koordinaten (x, y und z) und für die Berechnung benötigten Eingangsdaten der einzelnen Stätten, Lärmrelevante Sport- und Freizeitanlagen wurden mittels Messung beurteilt, andere erhielten Standarddaten aus der Fachliteratur zu 4.) Emissionsberechnung erfolgte nach RLS-90, Angabe von Koordinaten (x, y und z) und für die Berechnung benötigten Emissionsdaten (Regelqerschnitt, DTV, p, Straßenoberfläche, Steigung, Straßengattung) der Steckenabschnitte, die Zähldaten liegen für alle Städte für den Istzustand, für ausgewählte auch für verschiedene Prognosevarianten 2010 vor. Die Emissionsdaten können mit einem Editor aktualisiert werden. zu 5) Emissionsberechnung erfolgte mit Schall 03. Die Zähldaten liegen für alle Städte für den Istzustand und für den Prognosezustand 2010 vor. Rangierverkehr teilweise mit Akustik 04, sonst über FBS nach DIN18005. zu 6.) Emissionsberechnung über FBS nach DIN 18005 bzw. für Motorboote als Linienquelle, Eingangsdaten abgeschätzt zu 7.) Berechnung der Emissionen ausschließlich über FBS Folgende Projekte wurde in den einzelnen Jahren bearbeitet bzw. sind geplant: 1992 Güstrow (SIP) 1993 Rostock (V), Schwerin (V), Greifswald 1994 Stralsund, Wismar, Neubrandenburg, Grevesmühlen 1995 Bützow, Ludwigslust 1996 Güstrow (SIP, LMP), Waren 1997 Neustrelitz, Ribnitz-Damgarten, Laage, Malchin 1998 Malchow, Bad Doberan, Wolgast (SIP), Anklam, Pasewalk, Parchim 1999 Neubukow, Wittenburg, Wolgast (LMP) 2000 Hagenow, Bergen, Kaiserbäder (Ahlbeck, Her.-dorf, Bansin) 2001 Teterow, Boizenburg, Neustadt-Glewe, Amt Krakow am See
Beim Landratsamt München wurde eine wasserrechtliche Erlaubnis für die Entnahme von Grundwasser zum Betrieb einer beantragt. Im Wasserrechtsverfahren war im Rahmen einer standortbezogenen Vorprüfung des Einzelfalles festzustellen, ob die Verpflichtung zur Durchführung einer Umweltverträglichkeitsprüfung besteht (§ 5 Abs. 1 i.V.m. § 7 Abs. 2 UVPG und Nr. 13.3 der Anlage 1 zum UVPG).
Die GB-GmbH beabsichtigt, ihre Anlage zur Schlammbehandlung durch folgende Maßnahme wesentlich zu ändern: • Errichtung und Betrieb einer Waschanlage für Stahlfässer • Ausweitung des Annahmekatalogs • Verschiebung der Behandlungs- und Zwischenlagerkapazitäten von nicht ge-fährlichem zu gefährlichem Abfall Der Anlagenstandort befindet sich in 46395 Bocholt, Telingskamp 13, Gemarkung Mussum, Flur 8, Flurstück 114.
Das Projekt "Retention capacity of posidonia shale in respect of seepage water containing heavy metals from flue-dust dumps. Modelling of migration mechanisms based on laboratory tests and work on site" wird vom Umweltbundesamt gefördert und von Universität Karlsruhe (TH) durchgeführt. General Information: The dump sites used for the storage of residues from the various phases of steel production have to meet very special criteria. Flue dust and washing-tower sludge contain extremely high proportions of heavy metals and, in accordance with the Council Directive of 20 Match 1978 on toxic and dangerous waste, wastes containing Pb, Cd and As are among those requiring priority consideration. Seepage water in dumps results in the leaching of heavy metals and, if no precautions are taken, in the penetration of pollutants into the earth or groundwater. The base of a dump can act as a barrier against the migration of pollutants into the groundwater and biosphere, if its permeability is low and its sorption capacity high, and if the body of rock has little tendency toward destabilization and is homogenous and thick (20 m). Rocks with these favourable characteristics are generally argillaceous. In order to establish whether a rock would be suitable for a dump base, laboratory tests are normally carried out to check the above characteristics. The laboratory data are then applied to site conditions. However, the modelling of these conditions on laboratory data often involves major uncertainties. In this case we are in the fortunate position of being able to study a flue-dust dump which has been in existence for several decades and is located on a favourable barrier rock, Posidonia shale. A long-term in-situ test which would be very difficult to simulate in a laboratory has been carried out at this dump. When modelling heavy-metal migration the normal process can be reversed. The actual situation is recorded very precisely, and pollutant migration during recent decades reconstructed. Parallel laboratory tests using the same uncontaminated rock and the same pollutants are carried out, and a model is constructed using conventional methods. The validity of such a model can then be checked, and if necessary the model can be corrected so that it corresponds to what has actually happened. In addition to establishing the value of laboratory tests for ascertaining the suitability of a dump site, it will also be possible to show whether Posidonia shale is suitable for flue-dust dumps. Posidonia shale or 'oil shale' (Lias) is often found very near to iron and steel industry works, as it constitutes the under bed of mined dogger ore. From the point of view of infrastructure, Posidonia shale is therefore a favourable site and is in fact often used as such. Furthermore, a better understanding of complex migration processes (hydro-dynamic dispersion, molecular diffusion, ion exchange, adsorption/desorption, solution-precipitation, formation of organometallic complexes, flocculation-peptization, movement of colloid particles, etc) can help to establish whether any pre-treatment of the material to be dumped or the dump base is necessary.
Das Projekt "6 MWTH koenig ludwig atmospheric fluidized bed combustion plant" wird vom Umweltbundesamt gefördert und von Ruhrkohle AG durchgeführt. Objective: To refine and improve atmospheric fluidized bed combustion technology such that: 1. coal fines, coal/water slurry, and fuels from conditioned domestic refuse can be used; 2. noxious emissions (especially SO 2, NO X, HF, HCP, and heavy metals) are reduced; and 3. ashes are disposed off without using special waste tips and in an environmentally acceptable manner. Energy substitution equal to 1500 TOE is projected. General Information: The project was conducted at the existing 6-Mwth AFBC pilot plant Koenig Ludwig in Recklinghausen. This plant, operating since 1980, serves as a steam generator for the industrial sector and provides decentralized heat for the public sector. AFBC technology has operated satisfactorily to date however, numerous technical improvements will be tested in 9 phases: Phase I - Additional equipment to facilitate testing and measuring during the project, the following were installed: storage facilities, handling equipment and feed systems; improvements to the steam generators including absorbent feed systems and secondary air injection system; and additional sampling points. Phase II - Minimization of SO2 HF, and HCL emissions feed devices, which uniformally distribute ultrafine lime powder above the nozzle plate, will be developed. It is expected that minimal additions of limestone will reduce noxious emissions and that ash as well as CaO content in the ash will also be reduced. Phase III - Combustion of washed coal fines prior to the project, the plant could handle only lump-size fuels up to 30mm. A simple and reliable fuel handling and feed system will be developed to handle coal fines. Phase IV - Combustion of coal/water slurry the suitability of coal/water slurry as an AFBC fuel will be tested with regard to mixture stability in transportation and storage, combustion, fuel efficiency and noxious emissions. Phase V - Combustion of eco-briq briquettes plus bituminous coal combustion of conditioned domestic refuse combined with bituminous coal will be tested with an emphasis on reducing emissions of inorganic chlorine compounds. Phase VI - SECONDARY AIR INJECTION The plant was equipped with secondary air injectors and the radiation chamber (freeboard) enlarged by using a suitable refractory lining. It was expected that this would improve the burn-up rate and reduce NO X and CO emissions. PHASE VII/VIII - ASH UTILIZATION AND DISPOSAL The solubility of trace element compounds in AFBC ashes were analysed. A lysimeter, consisting of a 10 m3 open tank exposed to the weather, will be used. Its rain and snow-water contents will be examined for trace element compounds. Potential applications for using AFBC ash was to be developed. PHASE IX - EVALUATION/REPORT Combustion of highly sulphur loaded GCA combined with bituminous coal to be tested with emphasis on reducing SO2-emission. Achievements: PHASE I: Systems and components for storing, feeding and distributing of granulated and pulverized limestone above
Das Projekt "Optimierung der Fluor- und Staubabscheidung bei Aluminium-Altanlagen" wird vom Umweltbundesamt gefördert und von VAW aluminium, Forschung und Entwicklung durchgeführt. Durch Verbesserung der Abgaserfassung bei Horizontalspiessoederbergoefen war der Fluorgehalt der Abgase nach Verlassen der Duesenwaschanlage um ca. 1,8 mg gestiegen. Dadurch erhoehte sich der Fluorausstoss ueber die Waschanlage um ca. 8.000 kg/a. Wenn auch die Gesamtfluoremission durch die bessere Sammlung der Abgase verringert werden konnte, so war diese Erhoehung durchaus unbefriedigend. Bei der Suche nach Loesungen zur Verbesserung der Abgasreinigung musste beruecksichtigt werden, dass es sich bei dem Elektrolysesystem um eine sehr alte Anlage handelt, die nicht ohne weiteres hoehere Kapital- und vor allen Dingen Betriebskosten tragen konnte. Ein neues Waschsystem, das die Reinigung der Gase mit Hilfe eines Schaumbettes vornimmt, wurde in einer 2.500 m3/h-Pilotanlage auf seine generelle Eignung getestet. In einem Forschungsprojekt wurde dieses System in 100facher Leistung bis zur vollkommenen Betriebsreife entwickelt, wobei die Betriebsdaten optim iert wurden. Dabei stand hauptrangig im Vordergrund, den Fluorgehalt auf einen Wert kleiner gleich 1 mg/Nm3 zu senken. Das Ziel konnte erreicht werden. Die Messungen des Fluorgehaltes im Reingas, nach Abschluss der Optimierungsarbeiten, liegen in der Groessenordnung von 0,5-0,7 mg F- g/Nm3. Fuer die Erreichung dieses Wertes wird zusaetzlicher Energieaufwand von rd. 700 MWh/a benoetigt. Der Gesamtenergieaufwand der untersuchten Waescherkombination liegt 34-54 Prozent unter dem ueblicher Nasswaschverfahren. Durch das erzielte Ergebnis konnte die spezifische Fluoremission des zugehoerigen Elektrolysesystems um 0,5 kg/t Aluminium gesenkt werden. ...
Die BMW AG beantragte mit Schreiben vom 28.10.2020 unter Vorlage entsprechender Planunterlagen die Erteilung der immissionsschutzrechtlichen Genehmigung für die wesentliche Änderung der Anlage zum Bau und zur Montage von Kraftfahrzeugen durch Umbau der bestehenden Teststrecke für Fahrzeuge (Geb. 57.0), Errichtung einer Förderstrecke (Fahrzeughighway, Geb. 57.1), Änderungen an den Elektrohängebahnen (Geb. 96.8/9), Errichtung verschiedener Vordächer und einer neuen zentralen Waschstraße (Geb. 54.0).
Das Projekt "Teilprojekt 1" wird vom Umweltbundesamt gefördert und von Leibniz-Institut für Agrartechnik und Bioökonomie e.V. durchgeführt. Ziel des Projektes ist es, eine innovative Methode zur Hygienisierung des Prozesswassers für verzehrfertige Schnittsalate zu entwickeln, die eine Rückführung des aufbereiteten, mikrobiologisch und lebensmittelrechtlich unbedenklichen Wassers in den Waschprozess erlaubt und damit zu einer Erhöhung der mikrobiologischen Sicherheit im Prozess beiträgt bei gleichzeitiger deutlicher Reduktion des Wasserverbrauchs. Dafür ist die Entwicklung einer Durchfluss-Einkammer-Elektrolysezelle geplant, die ohne Additive auskommt und in neue und bestehende Salatwaschanlagen integriert werden kann. Die zu entwickelnde Zelle soll über eine Steuer- und Regeleinheit in-time bedarfsgerecht das Waschwasser hygienisieren. Als Grundlage der Steuerung wird in Labor- und Industrieversuchen die mikrobiologische und chemische Datenbasis erhoben. Der Behandlungserfolg der Neuentwicklung wird durch Versuchsreihen beim Industriepartner ermittelt und einer Bewertung unterzogen. Zur Aufbereitung von Salatwaschwasser wird Fa. aquagroup eine Durchfluss-Einkammer-Elektrolysezelle entwickeln, die ohne Additive auskommt. Die Zelle soll über eine Steuer- und Regeleinheit in-time bedarfsgerecht das Waschwasser hygienisieren und eine Kreislaufführung ermöglichen. In Industrie- und Laborversuchen wird die für die Steuerung notwendige mikrobiologische und chemische Datenbasis erhoben. Bei Havita erfolgt eine Ist-Standanalyse zu Wasserverbrauch, mikrobieller und chemischer Belastung von Waschwasser und Produkten. In Laborversuchen werden die Wirksamkeit auf relevante Mikroorganismen ermittelt und Störfaktoren identifiziert. Beide Datensätze bilden die Grundlage für die Dimensionierung der Industriezelle und die Entwicklung der Steuer- und Regeleinheit. Fa. Kronen entwickelt ein robustes, reinigungsarmes System zur Abtrennung von organischen Partikeln aus dem Prozesswasser. Die Systemkomponenten werden in einem Waschsystem zusammengeführt und bei Havita getestet, ggf. optimiert und einer Bewertung unterzogen.
Origin | Count |
---|---|
Bund | 85 |
Land | 20 |
Type | Count |
---|---|
Ereignis | 1 |
Förderprogramm | 81 |
Text | 11 |
Umweltprüfung | 7 |
unbekannt | 4 |
License | Count |
---|---|
closed | 20 |
open | 80 |
unknown | 4 |
Language | Count |
---|---|
Deutsch | 104 |
Englisch | 5 |
Resource type | Count |
---|---|
Archiv | 1 |
Datei | 1 |
Dokument | 7 |
Keine | 72 |
Webseite | 25 |
Topic | Count |
---|---|
Boden | 81 |
Lebewesen & Lebensräume | 78 |
Luft | 70 |
Mensch & Umwelt | 104 |
Wasser | 81 |
Weitere | 103 |